Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Golden Glades
If you’re planning an addition or an ADU on a Golden Glades lot, the numbers land in a wide but predictable band: a room addition typically runs $45,000 – $130,000, a detached ADU $90,000 – $220,000, and a garage conversion $30,000 – $80,000. What actually drives your number here isn’t the floor plan. It’s the ground under it. Golden Glades is unincorporated, so permits go through Miami-Dade County, the water table sits high, and septic and well setbacks can reshape a footprint before anyone pours concrete. We know this area and how its lots behave. Call (844) 651-6043 to schedule a free estimate.
Why Golden Glades Homeowners Call North Miami Beach Construction for Home Additions & ADU
Golden Glades homeowners tend to call us because they want one contractor handling the whole job instead of juggling a framer, a roofer, a window installer and a paver crew. We work across seven trades – roofing, windows and doors, kitchens, bathrooms, additions and ADUs, fencing, and driveways and pavers – under one contract and one point of contact. That matters on an addition, where the roofline ties into the new walls and the new walls need impact-rated openings that match the existing house.
Our technicians have up to 9 years of experience, and they work on everything from 1950s concrete-block homes to newer infill townhomes. We’re licensed and insured, and every estimate is free and written line by line, so you can see the allowances before you sign anything.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Golden Glades
We handle the full range of addition and ADU work in Golden Glades, from a single new room to a standalone unit in the yard. Here’s how each piece usually works.
ADU Design & Permitting
Permitting is where most Golden Glades ADU projects live or die, because there’s no city building hall to walk into. Everything runs through Miami-Dade County’s ePlan review, and the drawings have to be ready for that system on the first submission. We scope the site plan, drainage engineering and floodplain documentation up front so the county review doesn’t stall once excavation starts.

Garage Conversion ADU
A garage conversion is the most practical path to an ADU on a Golden Glades lot that’s already tight on open space. It still has to meet Florida Building Code High-Velocity Hurricane Zone requirements for wind-load connections and impact-rated openings, which surprises a lot of homeowners. We plan those from the start so the conversion passes inspection without tearing out finished work.

New Detached ADU
A detached ADU gives you real separation, but on a Golden Glades lot it means resolving septic and well setbacks before you commit to a footprint. We check the utility easements first, then design the unit around what the lot can actually support. If a traditional stick-built structure doesn’t fit your timeline, our home additions & ADU team can walk you through prefab and modular options from partners like Abodu and Dvele alongside conventional construction.

Junior ADU & Interior Conversion
A junior ADU or interior conversion works within the existing footprint, but it still needs county permits and code compliance for egress, ventilation and moisture control in a subtropical climate. We map the layout around the existing structure so the conversion reads as part of the house, not an afterthought. Existing jalousie windows and older carports often need upgrading to meet current impact and wind standards during an interior conversion.
Trusted Brands We Service in Golden Glades
We specify brand-name materials so you can look up what’s going into your addition before you sign anything. For prefab and modular ADU paths, we work with Abodu, Cover and Dvele, giving you a fast-track option alongside traditional construction. Impact-rated openings come from brands engineered and certified for high-wind, high-humidity environments, and roofing ties into manufacturer programs from GAF, CertainTeed and Owens Corning. We don’t stock parts on a truck. We source to spec and bring warranted materials to your Golden Glades job.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Golden Glades Homes
- Permit scoping that ignores ePlan and floodplain rules. When drainage engineering and floodplain documentation aren’t ready for Miami-Dade County review, the job stalls and change orders pile up. We build those into the plan before a single inspection.
- Septic and well setbacks found mid-excavation. On open Golden Glades lots, a footprint that was never checked against utility easements can hit a septic field at the rough-in stage. We verify setbacks before you commit to a design.
- Material haul and equipment access on open lots. A long gravel drive or soft subfloor can stall a concrete pour and inflate the draw schedule. We scope access and grading before quoting.
- Undervalued wind-load connections and impact openings. Continuous wind-load connections and impact-rated openings are standard in the High-Velocity Hurricane Zone, but they’re easy to lowball in an initial allowance. We price them honestly from the start.
Pricing for Home Additions & ADU in Golden Glades, FL
These are typical estimated ranges for the Golden Glades market. They’re a starting point, not a final number – the written estimate you get after we scope the site is what sets the price. What moves your figure most is site work: how shallow the water table sits, whether septic and well setbacks force a footprint change, and how much grading and drainage the county requires. Allowances for impact-rated openings and wind-load connections also shift the total. We provide free, written line-item estimates so you can see where the money goes.
| Project Type | Typical Estimated Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Golden Glades
Golden Glades sits at a busy crossroads, and we work the surrounding communities too. If you’re in Ives Estates, Ojus, North Miami or North Miami Beach, the permitting landscape may differ from unincorporated Miami-Dade, but the approach stays the same: scope the site before quoting. Whether you’re adding square footage or upgrading what you already have, we cover it from your driveway to your roofline.
Serving Golden Glades, FL – Our Local Coverage Area
We serve Golden Glades and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Golden Glades
Yes. Because Golden Glades is unincorporated, your ADU permits go through Miami-Dade County’s ePlan and inspection system rather than a local building department. That differs from a city like North Miami, where you’d deal with a municipal building hall. The county route means your drawings, drainage engineering and floodplain documentation all have to be submission-ready for ePlan up front. Call (844) 651-6043 to start a free estimate.
Setbacks can change both the footprint and the budget. If your planned addition or ADU overlaps a septic field or comes too close to a well, the design shifts, the site prep grows, and the cost follows. We check setbacks against the lot’s utility easements before we design, so you’re not surprised at excavation. Call (844) 651-6043 for an exact quote – estimates are free.
It means even a small addition or bump-out often needs engineered drainage and floodplain documentation before the county signs off. The water table sits high enough that excavation can reveal surprises, and that’s exactly why we scope site prep and grading before quoting. A qualified local contractor will factor in the water table from day one rather than discovering it mid-pour. Call (844) 651-6043 to schedule your free estimate.
We set allowances in the written line-item estimate and make clear what each one covers, so a change order only happens when the scope genuinely changes. On Golden Glades lots, the usual triggers are county ePlan review requiring additional drainage engineering, or excavation revealing how shallow the water table sits. We talk through any change and its cost before the work moves forward. Call (844) 651-6043 for a free estimate.
Yes, as long as the conversion is planned around those requirements from the start. That means continuous wind-load connections and impact-rated openings, which are standard in the High-Velocity Hurricane Zone and easy to undervalue in an initial allowance. A garage conversion typically runs $30,000 – $80,000 in Golden Glades, and the final price is set by the written estimate. Call (844) 651-6043 to schedule your free estimate.
Ready to plan your addition or ADU? Call North Miami Beach Construction at (844) 651-6043. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. We’re licensed and insured, every estimate is free and written line by line, and we pull the permits and see the inspections through.
Written by the team at North Miami Beach Construction.